久久免费福利,精品视频在线你懂得,精品视频网站,国产激情综合

Ministry of Industry and Information Technology electronics industry standard household photovoltaic grid-connected power generation system - Part 2-5: Design specification system access design compli

Author:杭州領(lǐng)祺科技有限公司 Date:2022-12-22 Reading:

Household photovoltaic grid-connected power generation systems - Part 2-5: Design

Standardize system access design

Residential grid-connected photovoltaic system-Part 2-5:Design specifications-grid connection

(Draft for comments)

August 26, 2022

When submitting your feedback, please include any patents that you are aware of, along with supporting documentation.

XXXX XXXX release XXXX-XX-XX implementation

Ministry of Industry and Information Technology, PRC

directory

People's Republic of China electronics industry standard

Household photovoltaic grid-connected power generation systems - Part 2-5: Design specification - system access design

1 range

2 Normative reference files

State Electricity Regulatory Commission Decree No. 5 Power secondary system safety protection provisions

3 Terms and Definitions

3.1

4. Universal requirements

4.1 Access Adaptability

4.1.1 Grid voltage range

4.1.2 Power frequency range

4.2 Starting and Stopping

4.3 Power Quality

4.3.1 Harmonics and interharmonics

4.3.2 Voltage deviation

4.3.3 Voltage fluctuation and flicker

4.3.4 DC component

4.3.5 Three-phase voltage Unbalance

4.4 Security and Protection

4.4.1 Anti-island protection

4.4.2 Residual Current Protection

4.4.3 Voltage and frequency protection

4.4.4 Short Circuit Protection

4.4.5 Isolation and switching

4.4.6 Reverse Power Protection

4.5 Electric Energy Measurement

4.6 Communication

4.7 Power factor adjustment

4.8 Security Identifier

5 Requirements for grid-connected equipment

5.1 Inverter Connection Requirements

5.2 Adding Cages to the System

5.2.1 Requirements for grid-connected interface Circuit breakers

5.2.2 Requirements for over and under voltage protection and automatic reclosing

5.2.3 Requirements on Lightning Protection and Surge Protection

5.2.4 Requirements for Obvious Disconnect Points

5.2.5 Grounding Requirements

6 Grid-connected access mode

6.1 Overview

6.2 Full Internet Access

6.3 Connecting to the Internet for Self-use and Surplus power

6.4 All for personal use

Household photovoltaic grid-connected power generation systems - Part 2-5: Design specification - system access design

1 range

This document specifies the basic requirements to be followed for household photovoltaic grid-connected power generation systems to be connected to the grid.

This document applies to access users with 220V or 380V voltage class built in residential fixed buildings, structures and ancillary places

For household photovoltaic grid-connected power generation system of side grid or public grid, the single point access capacity of 220V voltage class should not exceed 8kW,380V

Voltage level The single-point access capacity should not exceed 400kW. This document does not apply to photovoltaic systems with energy storage, concentrating photovoltaic systems and BiPVs

The system.

2 Normative reference files

The contents of the following documents constitute the essential provisions of the documents through normative references in the text. Where, note the date of the citation

Only the version corresponding to that date applies to this document: the reference document without noting the date, its latest version (including all amendment orders)

Suitable for wood files.

GB/T 2297 Terms for solar photovoltaic energy systems

GB 2894 Safety marks and guidelines for their use

GB/T 12325 Power quality Power supply voltage deviation

GB/T 12326 power quality voltage fluctuation and flicker

GB/T 13955 Residual current action protection device installation and operation

Low-voltage switchgear and controlgear - Part 2: Circuit breakers

GB/T 14549 Power quality Public grid Harmonics

GB/T 15543 Power quality Three-phase voltage imbalance

GB/T 24337 Power quality Intergrid harmonics

GB/T 29319 photovoltaic power generation system access to the distribution network technical regulations

GB 50054 Specification for design of low-voltage distribution

GB 50057 Code for design of lightning protection for buildings

GB/T 50065 Design specification for grounding of AC electrical devices

NB/T 32004 Technical specification for grid-connected photovoltaic inverters

NB/T 42142 Technical specification for photovoltaic grid-connected micro inverters

DL/T 448 electric energy metering device technical management regulations

DL/T 645 Multifunctional watt-hour meter communication protocol

State Electricity Regulatory Commission Decree No. 5 Power secondary system safety protection provisions

3 Terms and Definitions

The terms and definitions defined in GB/T 2297 and the following apply to this document.

3.1 point of interconnection(POI) Output summary point of the PV power generation system.

gird-connected box Gird-Connected box is used to connect the photovoltaic power station and the power distribution device of the power grid between the AC output side of the inverter of the photovoltaic power generation system and the connecting point or load.

point of connection point of conmon coupling(PCC) where photovoltaic (power generation or electricity consumption) is connected to the public power grid.

3.4 islanding

A state in which the part of the grid containing load and power continues to operate in isolation from the main network. Islands can be divided into unplanned islands and planned islands.

Note: Unplanned island refers to an unplanned and uncontrolled island. Planned island refers to the occurrence of planned islands according to pre-configured control policies.

3.5 anti-islanding Anti-islanding Prevents unplanned islanding.

4. Universal requirements

4.1 Access Adaptability

4.1.1 Grid voltage range

The grid voltage of photovoltaic power generation system is between 85% and 110% nominal voltage.

4.1.2 Power frequency range

The grid connection frequency of the photovoltaic power generation system is within the range of 49.5Hz ~ 50.2Hz.

4.2 Starting and Stopping

The startup, shutdown and restoration of the photovoltaic power generation system shall meet the requirements of GB/T 29319.

4.3 Power Quality

4.3.1 Harmonics and interharmonics

After the photovoltaic power generation system is connected to the power grid, the sub-harmonics and inter-harmonics of the connecting point should meet the requirements of GB/T 14549 and GB/T 24337.

4.3.2 Voltage deviation

After the photovoltaic power generation system is connected to the power grid, the voltage deviation of the connecting point should meet the requirements of GB/T 12325.

4.3.3 Voltage fluctuation and flicker

After the photovoltaic power generation system is connected to the power grid, the voltage fluctuation and flicker of the connecting point shall meet the requirements of GB/T 12326.

4.3.4 DC component

The amount of DC current injected by the PV system into the common connection points should not exceed 0.5% of its AC current rating.

4.3.5 Three-phase voltage Unbalance

The three-phase voltage unbalance of 0.4kV system caused by the access of photovoltaic power generation system should meet the requirements of GB/T 15543.

4.4 Security and Protection

4.4.1 Anti-island protection

The photovoltaic power generation system should have the ability to quickly monitor the island and disconnect from the power grid immediately, and the anti-island protection action time should not be more than 2s.

4.4.2 Residual Current Protection

The photovoltaic power generation system shall have the function of residual current detection and protection, and shall meet the relevant requirements of GB13955, GB50054, NB/T32004, etc.

4.4.3 Voltage and frequency protection

4.4.3.1 Voltage protection

When the grid connection voltage of the photovoltaic power generation system is within the voltage range specified in Table 1, the power supply to the grid shall be stopped within the corresponding time.

Table 1 Protective action time requirements for abnormal voltage at connecting point of photovoltaic power generation system

Junction voltage (V)

Protective action time (s)

U<50% un="">

The maximum switching time does not exceed 0.2

Un 50% Un acuities were U < 85%

The maximum switching time does not exceed 2.0

Un 85% or less U Un 110% or less

Continuous operation

Un 110% or less U Un 135% or less

The maximum switching time does not exceed 2.0

U 135% or greater Un

The maximum smell time is not more than 0.2

Note 1:Un refers to the rated voltage of the grid at the connecting point of the photovoltaic power generation system

Note 2: The maximum switching time refers to the time between the occurrence of abnormal state and the stop of power supply to the grid

4.4.3.2 Frequency Protection

When the connecting point frequency of the photovoltaic power generation system exceeds the operating range of 49.5Hz to 50.2Hz, the power supply to the grid should be stopped within 0.2s.

4.4.4 Short Circuit Protection

The photovoltaic power generation system shall be equipped with short circuit protection for the power grid. When the power grid is short circuit, the overcurrent of the inverter shall be no more than 150% of the rated current, and the photovoltaic power generation system shall be disconnected from the power grid within 0.1s.

4.4.5 Isolation and switching

Manual and automatic circuit breakers should be installed in parallel cages connected to the photovoltaic power generation system and the power grid.

4.4.6 Reverse Power Protection

When the photovoltaic power generation system works in the grid-connected mode without countercurrent, it should be equipped with reverse power protection. When the reverse current is detected to exceed 5% of the rated output, the photovoltaic power generation system should automatically reduce the output within 0.5s to 2s or disconnect the photovoltaic power generation system from the grid.

Restoration of grid connection

After the system is disturbed, the photovoltaic power generation system is not allowed to connect to the grid before the grid voltage and frequency return to the normal range, and after the system voltage frequency returns to the normal range, the photovoltaic power generation system needs to go through an adjustable delay time, the delay time can be set to 20s-5min, set by the local power grid dispatching organization.

4.5 Electric Energy Measurement

4.5.1

Before the photovoltaic power generation system is connected to the power grid, the on-grid power quantity and the metering point of the grid power quantity should be specified. The power measurement point of the photovoltaic power generation system shall be located at the property right boundary between the photovoltaic power generation system and the power grid, and the property right boundary shall be determined according to the relevant regulations of the State. The on-grid electricity should be measured independently, and the configuration and technical requirements of the energy metering device installed at the metering point should meet the relevant requirements of DL/T 448.

4.5.2

The power metering device shall adopt a single-phase (three-phase) power meter with an accuracy of no less than 0.5S for active power and 2.0 for reactive power. At the same time, it shall have the functions of current, voltage, quantity and other information collection and three-phase current unbalance monitoring. It shall be equipped with a standard communication interface, capable of local communication and remote communication through the power information collection terminal. The energy meter communication protocol conforms to DL/T 645. The collection information of electricity meters shall be connected to the collection system of electricity consumption information of power users of the administrative department of the power grid and used as the basis for electricity energy measurement and price subsidies.

4.6 Communication

4.6.1

Information security protection measures should be taken: the collection and transmission of grid-connected operation information should meet the requirements of the State Electricity Regulatory Commission Decree No. 5 and other relevant system standards. It is advisable to upload information such as power generation, current, voltage, and power.

4.6.2

Electricity meters should be equipped with electricity information collection terminals, which can be connected to the existing collection system to realize remote transmission of electricity information to relevant departments.

4.7 Power factor adjustment

The power factor of photovoltaic power generation system should be adjustable from 0.95 ahead to 0.95 behind.

4.8 Security Identifier

The connecting points of photovoltaic power generation system should be marked conspicuously. Signs should indicate "warning" and other suggestive words and symbols. The shape of the sign,

Color, size and height shall comply with GB 2894.

5 Requirements for grid-connected equipment

5.1 Inverter Connection Requirements

The photovoltaic inverters used in the photovoltaic power generation system shall pass the testing or certification of the competent institutions and meet the requirements specified in NB/T 32004 and NB/T 42142.

5.2 Adding Cages to the System

5.2.1 Requirements for grid-connected interface Circuit breakers

5.2.1.1 A circuit breaker that is easy to operate, has clear breaking indication and is capable of breaking fault current shall be installed in the parallel cages.

5.2.1.2 The circuit breaker must have quick short-circuit break, remote trip, and meet the requirements of GB/T 14048.2 and GB/T 10963.1.

5.2.1.3 You are advised to use a circuit breaker that has the power and load terminal reverse connection capability. If a circuit breaker that does not have the power terminal reverse connection capability is used, the power terminal should be connected to the power grid side.

5.2.1.4 Miniature or plastic-case circuit breakers should be used.

5.2.1.5 The breaking capacity of the circuit breaker should be selected based on the level of short circuit current at the grid-connected interface with a certain margin.

5.2.2 Requirements for over and under voltage protection and automatic reclosing

And the cage should be installed with over and under voltage protection equipment, which has the function of loss of voltage trip, undervoltage trip, over voltage trip and voltage closing. The loss of voltage trip setting should be set at 20%Un, undervoltage trip setting should be set at 20%Un ~ 70%Un, over voltage trip setting should be set at 135%Un, trip should be in 1s action, The detected voltage setting value should be set to more than 85%Un, and the detected voltage closing should be operated within 10s ~ 60s.

5.2.3 Requirements on Lightning Protection and Surge Protection

5.2.3.1 A surge protection device must be installed inside the cage to protect the load device from the surge overvoltage. The specific model shall be determined according to the site conditions.

5.2.3.2 A circuit breaker or fuse should be installed before a surge protector whose breaking capacity must be greater than the maximum short circuit current.

5.2.4 Requirements for Obvious Disconnect Points

The photovoltaic power generation system should be installed on the grid-connected bus, which is easy to operate, suitable for mechanical locking and has an obvious disconnect point.

To ensure the safety of power facilities maintenance personnel.

5.2.5 Grounding Requirements

The surge protection devices must be grounded properly, and the grounding resistance must meet the requirements of GB 50065 and GB50057.

6 Grid-connected access mode

6.1 Overview

According to the different consumption modes of the photovoltaic power generation system, the photovoltaic power generation system can be connected to the distribution network in three ways: full access to the grid, self-generated and self-used surplus power to the grid, and all self-used.

(Press: 220V grid-connected <8kw,380v grid-connected <400kw>http://linkqi.cn)

6.2 Full Internet Access

In this access mode, all the electricity generated by the photovoltaic power generation system is countercurrent to the public grid. The power generation of photovoltaic power generation system and the power consumption of users are measured separately. The full access mode shall comply with the requirements in Figure 1. See Appendix A for the description of network points and common connection points.

wps1.jpg

Figure 1. Schematic diagram of full Internet access

6.3 Connecting to the Internet for Self-use and Surplus power

In this access mode, the electricity generated by the photovoltaic power generation system is preferentially supplied to the power load, and the remaining electricity is countercurrent to the public grid.

Countercurrent electricity and user electricity consumption are measured by bidirectional smart meters. The network access modes of self-use and surplus power should meet the requirements in Figure 2. For details about the network points and common connection points, see Appendix A.

wps1.jpg

Figure 2. Schematic diagram of network access for self-use and surplus power

6.4 All for personal use

In this access mode, all the electricity generated by the photovoltaic system is consumed by the user's electricity load, and the power shortage is supplemented by the public grid. The PV system has no electricity flowing upstream into the public grid. All self-use access modes shall comply with the requirements in Figure 3, and the description of network points and common connection points is shown in Appendix A.

wps3.jpg

Figure 3.


Share:

Hot Tag

Change a Group

Related Suggestion

久久免费福利,精品视频在线你懂得,精品视频网站,国产激情综合
av高清不卡| 在线免费观看亚洲| 免费欧美在线视频| 在线午夜精品| 中文字幕成人| 久久国产乱子精品免费女| 综合国产精品| 国产欧美亚洲一区| 欧美三区不卡| 国产乱码精品一区二区亚洲| 国产一卡不卡| 美女av在线免费看| 欧美日中文字幕| 一二三区精品| 久久av免费| 成人精品高清在线视频| 亚洲一本视频| 日韩精品一区二区三区中文 | 亚洲夜间福利| 亚洲tv在线| 精品视频久久| 91九色精品| 国产日韩亚洲欧美精品| а√天堂8资源在线| 欧美日韩国产免费观看| 日韩精品亚洲一区二区三区免费| 麻豆国产一区| 亚洲一区二区三区高清| 精品一区二区三区中文字幕 | 影院欧美亚洲| 国产精品99久久免费| 黄色成人在线网址| 国产精品国码视频| 鲁大师成人一区二区三区| 精品三区视频| 日韩精品一区二区三区中文| 日韩国产欧美| 国产精品亚洲片在线播放| 亚洲欧洲一区二区天堂久久| 国内精品麻豆美女在线播放视频| 久久不射中文字幕| 欧美13videosex性极品| 日韩高清一级| 久久亚洲欧美| 国产精品成人一区二区不卡| 日本一区二区三区视频在线看| 日本久久成人网| 国产一区二区三区四区五区| 国产欧美一区| 国产欧美自拍一区| 久久不射网站| 亚洲欧美视频一区二区三区| 精品视频高潮| 精品欧美日韩精品| 国产精品久久久久久模特| 红桃视频欧美| 亚洲欧洲午夜| 免费看的黄色欧美网站| 欧美三级第一页| 日韩精品一区二区三区中文在线 | 日韩影院二区| 久久一区欧美| 久久中文字幕一区二区| 国产精品草草| 精品亚洲自拍| 韩国精品主播一区二区在线观看| 国产精品毛片久久| 在线一区av| 香蕉国产精品| 日韩精品一区第一页| 亚洲免费成人av在线| 青青草国产精品亚洲专区无| 欧美日韩国产高清电影| 亚洲综合丁香| 国产日韩欧美一区二区三区| 国产精品精品| 福利一区二区三区视频在线观看| a日韩av网址| 蘑菇福利视频一区播放| 日本国产亚洲| 亚洲啊v在线| 麻豆精品91| 国产精品magnet| 日韩av免费| 性欧美长视频| 麻豆精品视频在线观看免费| 99国产精品免费视频观看| 亚洲成人不卡| 日韩高清不卡一区| 天堂资源在线亚洲| 日韩福利视频一区| 久久蜜桃av| 国产毛片精品| 最新亚洲一区| 高清不卡一区| 蜜臀久久久99精品久久久久久| 国产精品v日韩精品v欧美精品网站| а√天堂中文在线资源8| 石原莉奈一区二区三区在线观看| 一区二区三区四区日韩| 国产91在线精品| 97久久超碰| sm久久捆绑调教精品一区| 美女精品一区二区| 亚洲一区二区网站| 久久在线91| 日韩综合一区二区| 亚洲欧洲日韩精品在线| 欧美国产先锋| 日本不卡一区二区| 狠狠干成人综合网| 国产成人免费| 国产美女视频一区二区| 亚洲无线观看| 国产精品视区| 性欧美69xoxoxoxo| 精品视频在线你懂得| 亚洲三区欧美一区国产二区| 久久一区二区三区喷水| 国产麻豆一区二区三区| 日韩成人精品一区二区三区| 99精品视频在线观看免费播放| 国产va免费精品观看精品视频| 国产精品一国产精品k频道56| 日韩高清电影免费| 国产日韩精品视频一区二区三区| 日韩国产欧美一区二区三区| 在线精品视频一区| 亚洲视频二区| 日韩高清三区| 久久av网站| 日韩和的一区二在线| 国产suv精品一区二区四区视频| 国产精品福利在线观看播放| а√在线中文在线新版| 日韩综合精品| 中文精品视频| 一本一道久久a久久| 亚洲a级精品| 国产日产精品一区二区三区四区的观看方式| 日本一区免费网站| 国产精品极品国产中出| 日韩av片子| 欧美特黄一区| 欧美日韩视频免费看| 精品国产不卡一区二区| 欧美天堂视频| 91精品在线观看国产| 美女黄网久久| 久久男人av| 黄色成人精品网站| 欧美日韩视频免费看| 欧美一级鲁丝片| 午夜亚洲福利| 久久精品一区二区不卡| 亚洲制服一区| 欧美精选视频一区二区| 日韩1区2区3区| 久久一区二区三区喷水| 青青草91视频| 欧美日韩少妇| 国产剧情在线观看一区| 国产精品最新| 免费久久精品| 久久精品三级| 亚洲丝袜啪啪| 国产一在线精品一区在线观看| 日韩在线观看中文字幕| 久久婷婷亚洲| 久久免费精品| 91精品国产自产在线丝袜啪| 亚洲福利久久| 日韩久久电影| 国产精品麻豆成人av电影艾秋 | 美女国产精品久久久| 综合欧美亚洲| 成人在线视频免费| 国产日韩欧美高清免费| 亚洲免费毛片| 日韩中文字幕不卡| 亚洲视频播放| 伊人久久成人| 国产一区久久| 美女网站一区| 国产综合亚洲精品一区二| 中文字幕高清在线播放| 久久精品国产99国产| 国产精品红桃| 欧美黑人巨大videos精品| 国产精品片aa在线观看| 日本少妇精品亚洲第一区| 免费观看不卡av| 欧美成人日韩| 亚洲激情中文| 亚洲一区成人| 亚洲毛片一区| 国产亚洲一区| 国产精品久久久久av蜜臀| 欧美激情日韩| 亚洲美女久久精品|