久久免费福利,精品视频在线你懂得,精品视频网站,国产激情综合

National Energy Administration to promote new energy power generation projects should and do - leading Qi technology to undertake a full set of new energy power station grid-connected data dispatching

Author:杭州領祺科技有限公司 Date:2022-12-23 Reading:

并網架構1.jpg領祺電力監控系統圖(1).png

The National Energy Administration of China's Power Grid recently issued the Notice on Actively Promoting the Integration of New energy power generation Projects, which proposed that all power grid enterprises should take effective measures for wind power and photovoltaic power generation projects that meet grid connection conditions in accordance with the principle of "integration of efforts, integration of efforts and early integration" on the premise of ensuring the safety and stability of the power grid and orderly power supply. Ensure timely grid connection.

It is reported that wind power and photovoltaic power generation projects with grid-connected conditions are allowed to be grid-connected in batches, and the completion of full capacity is not a necessary condition for new energy projects to be grid-connected. In addition, the circular requires to increase the construction of supporting grid connection projects, with wind power and photovoltaic power generation projects to do a good job, and strive to synchronously completed and put into operation.

Since the beginning of this year, the domestic new energy power generation has continued to grow rapidly and maintained a high level of utilization. In the fourth quarter, the new energy production was concentrated and connected to the grid. Ensuring that new energy power generation projects are connected to the grid in time is conducive to increasing the supply of clean electricity and bringing into play the kurtosis of new energy. The role of supply protection during this period is also conducive to promoting clean and low-carbon energy transformation and helping to achieve the goal of peak carbon neutrality. (Reporter Liao Ruiling)

環網并網1.jpg

New energy

Grid-connected principle: Meet the local load first, and connect the remaining power to the grid. Local generation, local consumption, avoiding transmission losses (5%).

Power station power consumption calculation and power consumption calculation are the key to grid-connected design: power generation curve and local load demand curve should be matched as far as possible, so as to minimize the fluctuation of grid-connected input and reduce the pressure on the absorption capacity of the grid.

Incorporation voltage as low as possible, as low as possible to access the voltage, the second selected voltage, and then increase the high voltage.

Intelligent power measurement, remote communication, four remote and five defense communication are the key of networking. Hangzhou Lingqi Technology intelligent communication gateway is used in thousands of grid-connected photovoltaic power stations across the country, data acquisition communication and security communication, has accumulated a wealth of experience cases, willing to share with peers.

Junction point refers to the outlet of distributed energy power station.

The photovoltaic power station has a booster station, and the connecting point is the busbar or node on the middle voltage side of the booster station.

The photovoltaic power station has no booster station, and the parallel network is the output summary point of the distributed power supply.

An access point is an entry point for the grid to access a distributed energy power station, including dedicated line access and T access.

The grid can be a public grid or a consumer grid. For the BIPV system of a large public building, it is necessary to consider the actual situation of the existing power facilities and power load of the building. Try to meet the local load, the rest of the grid. Minimize the fluctuation of incoming network.

Special line access refers to the photovoltaic power station access point set up special switching equipment, such as access substation or switch station; T connection mode refers to the mode that the distributed power access point is not configured with dedicated devices, for example, the photovoltaic power station directly connects to the overhead or cable line.




環網并網2.jpg

For medium-sized photovoltaic power generation systems, one centralized connecting point (busbar - user power distribution room) is usually selected, but for large photovoltaic power generation systems, more than two connecting points can be selected according to the actual needs, in order to improve the reliability of system operation.

On the premise of ensuring the safe operation of the power grid and distributed photovoltaic, the installed capacity of distributed photovoltaic power generation project and the long-term planned installed capacity and other factors are taken into account to reasonably determine the voltage level and access point.

The photovoltaic grid-connected power generation system can be connected to the power grid in two ways: low voltage access and medium voltage access. The level of grid-connected voltage should be determined according to the conditions of the power network through technical and economic comparison demonstration. If both the lower and middle voltages are available, the lower voltage level is preferred.

1. Low-voltage power grid access

The low-voltage grid-connected system usually consists of 3 to 5 components in series, and the DC voltage is less than 120V. The advantage of this method is that each series of solar cell modules less series, strong tolerance to the sun shadow; The disadvantage is that the DC side current is larger, in the design need to choose a large section of DC cable. The grid-connected system is connected to the three-phase 400V or single-phase 230V low-voltage distribution network, which supplies power to local loads through AC distribution lines. The remaining power is fed into the public grid. According to whether it is allowed to generate electricity back to the public grid, the system can be divided into countercurrent grid-connected system and non-countercurrent grid-connected system.


并網準備.jpg

(1) Countercurrent grid-connected system. The generating power cannot exceed 30% of the capacity of the distribution transformer, and a bidirectional meter that can be measured is required.

② no countercurrent grid-connected system. There are generally two solutions:

The reverse power detection device is installed to communicate with the inverter. When the reverse flow is detected, the inverter automatically controls the power generation, realizing the maximum utilization of grid-connected power generation without the occurrence of reverse flow.

Two-way inverter + battery (PCS energy converter, energy conversion system) is adopted to realize the dispatching grid-connected power generation system. The solar array is charged by a bidirectional inverter and connected to the grid to generate electricity. The grid-connected power is adjusted by the measurement and control device according to the actual power of the local load. When the illumination energy is insufficient, the energy can be provided by the battery.

2. Medium voltage power grid access

Medium voltage grid-connected system is usually used in the system with high rated power of solar array. The number of solar cell modules in series is large, and the DC voltage is relatively high. The disadvantage of this method is that it has relatively small tolerance to the solar shadow. Advantages are high voltage, low current, the use of cable diameter is smaller, and the inverter better match, so that the inverter conversion efficiency is higher. At present, the medium voltage system is used in the large scale photovoltaic power generation system.

The grid-connected system is connected to the 10kV or 35kV medium voltage grid through the booster transformer. The booster grid-connected system should adopt a separate on-grid transformer to transmit power to the superior grid.


并網準備2.jpg并網準備3.jpg

The medium voltage grid-connected power generation system should be designed by the power supply department. The high and low voltage switchgear should be equipped with switch protection, metering and lightning protection devices. The actual grid-connected power generation should be measured at the medium voltage side.

High voltage grid access

The dispatching data network is based on the power communication transmission network and adopts the technical system of IPover SDH to realize the interconnection and interworking of the dispatching data network. The dispatching data network is physically isolated from the management information network, MPLS/VPN is deployed on the whole network, and all related services are connected to the corresponding VPN according to the principle of "security partition".

Scheduling data network composition

The dispatching data network is composed of two levels of network, that is, the backbone network is composed of state modulation, network modulation, provincial modulation and ground regulation points, and the corresponding access network is composed of direct dispatching stations at all levels. Each access network should be connected to the dual plane of the backbone network through two points respectively

In the backbone network and access network, the network is generally divided into core layer, convergence layer and access layer according to the scale of the network. The core layer is the intersection center of network services. Usually, the core layer only completes the function of data exchange. The aggregation layer is located between the core layer and the access layer and is used to gather and distribute services. The access layer mainly connects user services to the network for quality assurance and access control.


  • The dispatching data network configuration and service access mode of the PV power station are similar to that of the provincial PV power station; Two sets of dispatching data network devices are configured for the ground-regulated photovoltaic power station, which are connected to the ground-regulated human network. The service access mode is similar to that of the provincial direct-regulated photovoltaic power station.

  • The scheduling data network operates and manages according to the principle of "unified scheduling and hierarchical management". The dispatching data network equipment deployed in the photovoltaic power station shall be connected to the corresponding dispatching data network and access network management system, which shall be managed by the corresponding dispatching organization.

  • Features of photovoltaic grid-connected networking scheme of Trumpchi intelligent communication Gateway:

  • 1. The core networking equipment, Hangzhou Lingqi intelligent communication gateway, has the advantages of remote deployment, remote maintenance, multi-point delivery, flexible protocol, friendly project interface, fast project construction cycle, simple management, stability and reliability.

  • The communication management computer system is integrated into the box. Box change scheme has low construction cost, small area and beautiful appearance. Field installation only need to do box positioning, cable connection between boxes, outlet cable connection and other debugging work, from installation to operation time is short, greatly shorten the project construction cycle.

  • 2. Simple scheme and high power generation income

  • In the solution of 10KV and 35KV photovoltaic grid-connected system, the medium energy photovoltaic inverter can be used as a single stage conversion, and the inverter is connected to the isolation booster transformer (270v/10kv or 270v/35kv) directly into the power grid, without the need for low-voltage isolation transformer.

  • Simple scheme, high power generation income: reduce low voltage isolation transformer link, accelerate project construction progress, improve system reliability. At the same time, hundreds of thousands of transformer procurement costs per MW are reduced. High power generation income, for the photovoltaic inverter using low-voltage isolation transformer, the power generation efficiency of the system is reduced by 2%~3%. Based on the calculation of 1MW photovoltaic system, 80% of power generation is carried for 4 hours per day and the average loss of low-voltage isolation transformer is 2%, the medium energy photovoltaic system solution can generate 23,000 KWH more power per year, and the system life of 25 years can generate 467,000 KWH more power.

  • 3. Supply chain integration and out-of-the-box projects; abundant landing projects connected to various environments and accumulated experience

  • Intelligent surge protection junction box, DC surge protection distribution cabinet, inverter system, AC surge protection distribution cabinet, transformer, system distribution and box change, etc., the construction of a photovoltaic power station, need a huge supply chain integration work. Relying on the rich experience and resources of electrical system program integration and supply chain integration, Hangzhou Linkqi technology communication management machine supports the power E file standard, supports the IEC61850 protocol, is compatible with various inverter components, horizontal partition equipment, high and low voltage switchboard, and has been connected with a variety of power monitoring systems and power dispatching systems in the project practice. The implementation of the project is convenient and rapid.

  • 4. Flexible way of cooperation: there are cloud background of equipment and grid-connected monitoring system, which can provide only equipment or background and monitoring. WEB configuration of monitoring system is flexible and customized. It can monitor the daily energy yield, monthly energy yield, power generation curve, system machine running status information, sunshine amount, wind speed and other environmental information.



Share:

Hot Tag

Change a Group

Related Suggestion

久久免费福利,精品视频在线你懂得,精品视频网站,国产激情综合
色欧美自拍视频| 国产999精品在线观看| 日韩一区二区三区免费播放| 国产欧美另类| 国产欧美欧美| 欧美精品国产| 国产精品成人一区二区网站软件| 欧美日韩一区二区三区四区在线观看 | 在线看片国产福利你懂的| 久久伊人亚洲| av资源中文在线天堂| 国产精品高颜值在线观看| 97欧美在线视频| 欧美三区四区| 成人久久一区| 国产亚洲精品自拍| 亚洲欧洲av| 国产精品三级| 亚洲精品永久免费视频| 亚洲精品电影| 日本不卡一区二区| 精品国产成人| 亚洲天堂久久| 亚洲有吗中文字幕| 国产精品极品国产中出| 福利视频一区| 一级欧洲+日本+国产| 亚洲tv在线| 国产精品xxx在线观看| 中文字幕在线高清| 亚洲欧美成人综合| 欧美一区影院| 国内揄拍国内精品久久| 免费久久精品| 欧美性www| 精品中文在线| 亚洲精华国产欧美| 欧美久久香蕉| 久久久蜜桃一区二区人| 一区二区亚洲视频| 精品国产欧美日韩| 五月精品视频| 国产欧美啪啪| 久久一区二区三区电影| 亚洲精品日本| 最新中文字幕在线播放| 免费国产亚洲视频| 精品视频一区二区三区在线观看 | 久久成人福利| 日韩中文在线电影| 水野朝阳av一区二区三区| 美腿丝袜亚洲三区| 亚洲激情不卡| 精品国产欧美日韩| 中文字幕免费精品| 欧美男人天堂| 日本伊人午夜精品| 久久精品亚洲人成影院| 日韩高清欧美激情| 久久婷婷亚洲| 国产精品一站二站| 亚洲资源av| 精品高清久久| 日韩国产一二三区| 99视频精品全国免费| 欧美精品影院| 黄色av日韩| 国产一区二区三区黄网站| 伊人久久大香伊蕉在人线观看热v| 日韩精品1区| 国产欧美大片| 亚洲中字黄色| 色婷婷精品视频| 国产精品玖玖玖在线资源| 欧美在线综合| 日韩精品一区二区三区免费观影| 久久av综合| 日韩中文字幕1| 欧美日韩视频免费观看| 欧美亚洲网站| 亚洲欧美高清| 99久久久久国产精品| 精品国产亚洲一区二区三区| 婷婷精品在线| 国产精品毛片在线| 秋霞影视一区二区三区| 麻豆国产91在线播放| 天海翼精品一区二区三区| 欧美精选一区二区三区| 97国产精品| 久久中文在线| 欧美日韩黄网站| 午夜性色一区二区三区免费视频| 不卡中文一二三区| 人人草在线视频| 国产精品porn| 欧美午夜三级| 日本a级不卡| 亚洲欧洲免费| 视频精品一区二区| 日韩视频不卡| 不卡在线一区| 亚洲午夜黄色| 国产91一区| 亚洲日本网址| 日韩免费av| 国产精品99一区二区三| 免费在线欧美黄色| 久久99久久人婷婷精品综合| 青青国产91久久久久久| 亚洲青青久久| 日韩精品亚洲专区| 日本不卡一区二区| 日韩国产欧美在线视频| 日韩欧美在线精品| 日韩中文字幕无砖| 丝袜美腿亚洲色图| 亚洲婷婷丁香| 综合一区在线| 日韩国产在线观看一区| 奇米色欧美一区二区三区| 日韩精品中文字幕吗一区二区| 亚洲不卡视频| 久久精品xxxxx| 欧美一区网站| 日韩av一二三| 国产欧美精品| 欧美国产免费| 久久精品九色| 91视频一区| 久久中文亚洲字幕| 国产日韩专区| 亚洲男人在线| 日本a级不卡| 国产精品videossex| 久久精品国产免费| 国产传媒av在线| 欧美亚洲激情| 视频一区视频二区中文| 日韩高清在线观看一区二区| 日本a口亚洲| 精品久久在线| 欧洲av一区二区| 欧美日韩精品一本二本三本| 久久99伊人| 国产日韩一区二区三区在线| 国产精品66| 日韩欧美视频专区| 激情婷婷综合| 亚洲97av| 精品久久影院| 在线精品小视频| 日本中文字幕不卡| 卡一卡二国产精品| 欧美成a人免费观看久久| 亚洲女同一区| 欧美日韩亚洲国产精品| 日韩精品1区| 在线观看一区| 久久不见久久见国语| 91精品一区二区三区综合| 三级欧美韩日大片在线看| 欧美日韩a区| av资源亚洲| 蜜桃久久久久久| 久久精品国产网站| 夜夜嗨一区二区| 国产精品成人一区二区网站软件| 天堂日韩电影| 91综合久久爱com| 红杏一区二区三区| 日韩视频二区| 美日韩一区二区三区| 国产综合亚洲精品一区二| 日本h片久久| 国内亚洲精品| 日韩激情一区二区| 亚洲三级欧美| 视频一区二区三区在线| 久久精品福利| 麻豆91精品| 成人午夜网址| 免费不卡在线视频| 国产高潮在线| 亚洲精品激情| 岛国av免费在线观看| 亚洲综合五月| 丝袜美腿诱惑一区二区三区| 日产欧产美韩系列久久99| 久久精品二区三区| 国产精品调教| 国产女优一区| 美女av在线免费看| 日韩高清三区| 中文日韩欧美| 激情黄产视频在线免费观看| 日韩av一区二区三区| 99视频在线精品国自产拍免费观看| 美女尤物国产一区| 亚洲另类视频|